Experience the Olympic Games through the eyes of Atos Origin, the primary systems integrator and Worldwide IT Partner of the Olympic Games 2002-2012. Learn more about our role and the significant role technology plays in supporting a winning performance for the world’s greatest sporting event.
Events
Beijing 2008 – Olympic IT Project
|
Every two years the Games take place in a different location, with different people, different technologies, and different challenges…always with an immovable deadline. Atos Origin makes it work every time. As the Worldwide IT Partner and Top Partner for all Olympic and Paralympic Games from 2002-2012, Atos Origin has primary responsibility integrating, managing and securing the vast IT system that relays results, events and athlete information to spectators and media around the world.
High bandwidth | Low bandwidth
|
Atos Origin and IOC Extend Partnership to 2010
|
Singapore, 01 July 2005 - Atos Origin, the Worldwide Information Technology Partner of the International Olympic Committee (IOC), today announced that it has formally signed a contract extension with the IOC to become the Information technology systems integrator for the 2010 Olympic Winter Games in Vancouver, Canada, and the 2012 Olympic Summer Games.
Watch Video: High Bandwidth | Low Bandwidth
|
TORINO 2006: Preparing IT Operations
|
Atos Origin is achieving the preparation of the IT Operations for the Torino 2006 Olympic Games. This achievement has been captured in one video and the film illustrates how our team of more than 2,500 professionals managed and secured the complex IT infrastructure in 28 Olympic Games venues and delivered the Olympic results, event and athlete information to spectators and media around the world.
High bandwidth | Low bandwidth
|
ATHENS 2004: The Final Story
|
Atos Origin securely and successfully completed the IT Operations for the ATHENS 2004 Olympic Games. This achievement has been captured in two videos: Delivering Excellence and Technology Insights. The films illustrate how our team of more than 3,400 professionals secured the complex IT infrastructure in 60 Olympic Games venues and delivered the Olympic results, event and athlete information to spectators and media around the world.
Delivering Excellence High bandwidth | Low bandwidth
Technology Insight High bandwidth | Low bandwidth
|
ATHENS 2004: Virtual Atrium
 |
Visit the Virtual Atrium, an interactive tour behind the scenes of the ATHENS 2004 Olympic Games. Listen to our experts talk about the challenges they faced and successfully overcame with managing the programme, operations, partners, risk and security. Take a tour of the Technology Operations Center, Integration Test Lab, PC Factory and Data Centers.
Visit the virtual Atrium
|
Our Olympic People
|
Atos Origin securely and successfully completed the IT Operations for the ATHENS 2004 Olympic Games. This achievement has been captured in two videos: Delivering Excellence and Technology Insights. The films illustrate how our team of more than 3,400 professionals secured the complex IT infrastructure in 60 Olympic Games venues and delivered the Olympic results, event and athlete information to spectators and media around the world.
High bandwidth | Low bandwidth
|
Preparing for ATHENS 2004
|
Every two years the Games take place in a different location, with different people, different technologies, and different challenges…always with an immovable deadline. Atos Origin makes it work every time. Atos Origin creates and secures the complex, mission critical information systems that ensure the uninterrupted delivery of results, sport and athlete information to spectators and media around the world. During the Olympic Games, years of work culminate in just a few days of spectacular performance.
High bandwidth | Low bandwidth |